Home / Project Profiles / Highland Lake Asheville, NC
Project Solution

Requirement for the HVAC equipment to be in a conditioned air-sealed environment; meet the building code requirement for Energy Efficiency and Safety for Spray Foam Insulation; and to cover the exposed Fiberglass. Project Solution: New Attic Hybrid System for Cathedral Ceilings: - 2” x 10” framed roof (unvented) - 2” of 2lb or closed cell R-6.0 SPF - 6.25” of R-19 Fiberglass unfaced batt - Silver Shield multi-layer radiant barrier/reflective insulation