HURRICANE NOTIFICATION UPDATE: We hope all those affected in Florida are safe and recovering quickly from Hurricane Milton. FI-FOIL will resume all normal operations, reopening on Monday, October 14 at 8:00am. We wish you all the best. Please continue to stay safe in the weeks ahead, as we fully recover in the hardest hit areas across the state.

FI-FOIL reflective insulation manufacturer and supplier florida

Insulating Efficiently in Florida’s Public Schools

Project Solution | Insulation for Hot & Humid Climates Polk County Public Schools, Bartow, Florida needed a way to meet Florida Building Codes and install the batt insulation above their drop-in acoustical ceiling tiles so it would be easier to repair and replace ceiling tiles, work [...]

Davenport Middle School

Project Solution: FI-FOIL® Insulation in Action Keeping Students Cool Against Florida Heat And Humidity Commercial building code requires Class A rated facing on insulation installed above suspended ceilings. To lower costs, BMK Architects specified FSK Shield™, as Class A rated facing, with unfaced batt insulation. This hybrid system [...]

Bok Tower Gardens

Project Solution For Hot & Humid Climates Product Application: The FSK Shield™ Class A, fire-rated, aluminum facing changes the air film coefficient to Low-e (emittance). It's an insulated roof deck (see images 1 and 4). According to the ASHRAE Handbook Tables, this application adds an R-4.6 [...]

Winter Haven High School

Project Solution Commercial building code requires Class A rated facing on insulation installed above suspended ceilings. Project Solution: FSK-faced batt insulation was too expensive, so the architect specified FI-FOIL FSK Shield™ as Class A rated facing, with unfaced batt insulation. To allow access to the mechanical [...]

Cornerstone Custom Home Rice; Lake Loop, Longwood, FL

Project Solution | Increase R-Value with FSK Shield™ Unframed barrier walls that needed a Class A fire-rated material, which spray foam could adhere to, and that could span large areas without stretching. Project Solution: FI-FOIL FSK Shield™ has two facings - a low-emittance foil layer and [...]

Freshman Academy at Haines City High School

Project Solution | FSK Shield™ Boosts R-Value & More Polk County School Board has included FI-FOIL FSK Shield™ as part of their building standard for several years now, and it continues to provide them with a lower cost option to FSK-faced Batt Insulation. A durable support [...]

Sweet Tomatoes; West Palm Beach, FL

Project Solution This was the 99th restaurant in the chain and the first operated under the Sweet Tomatoes brand to feature a new prototype design. The new design offers a “contemporary farmer’s market” look, combining authentic and new, earthy and industrial. The exterior was designed with [...]

Go to Top