Insulating Efficiently in Florida’s Public Schools
Project Solution | Insulation for Hot & Humid Climates Polk County Public Schools, Bartow, Florida needed a way to meet Florida Building Codes and install the batt insulation above their drop-in acoustical ceiling tiles so it would be easier to repair and replace ceiling tiles, work [...]
RetroShield® Helps SC Harley Dealer Turn Down The Heat
Project Solution: FI-FOIL® Insulation Proves Victorious Against South Carolina Heat and Humidity Low Country Harley-Davidson was hot. As the largest Harley sales and service center in South Carolina, Low Country is a popular and well-respected business. But the issue in this case was more literal – the building [...]
Davenport Middle School
Project Solution: FI-FOIL® Insulation in Action Keeping Students Cool Against Florida Heat And Humidity Commercial building code requires Class A rated facing on insulation installed above suspended ceilings. To lower costs, BMK Architects specified FSK Shield™, as Class A rated facing, with unfaced batt insulation. This hybrid system [...]
TNAH 2021: Living Large and Efficiently in Central Florida with FI-FOIL®
Project Solution | FI-FOIL® Insulation Wins Again Against Extreme Heat The New American Home 2021 and FI-FOIL® Tackle Florida Heat and Humidity Products Used: FI-FOIL® Flex Foam Closed Cell Polyethylene Reflective Foam and M-Shield® Project Location: Winter Park, FL The Vision: Turning Convention on its (Mouse) [...]
Venturini Motorsports Chooses RetroShield® for Sleek Ceiling Refit
Project Solution | RetroShield® Keeps Things Cool Against Carolina Heat and Humidity Bill Venturini is a legend in the racing world. A former NASCAR champion and two-time Automobile Racing Club of America (ARCA) Racing Series champion, he holds the all-time qualifying records at Daytona International Speedway and [...]
Insight Auctioneers; Sebring, FL
FI-FOIL® Helps Insight Auctioneers Against Florida Heat & Humidity Insight Auctioneers built a new office/warehouse, and they wanted a metal building insulation that would not absorb moisture while keeping their building cooler in the hot Florida summer.
Highland County State Fairgrounds; Sebring, FL
Project Solution | RetroShield® | For Hot and Humid Climates The 20-year fairgrounds’ arena was showing it’s age, with vinyl-faced insulation seams separating and sections falling down and needing a face-lift. Project Solution: West Coast Insulation of Sebring, FL, had installed FI-FOIL® insulation system RetroShield® on a [...]
New York Power Authority Selects GFP Insulation for Renovation Project; White Plains, NY
Project Solution | Insulation for Hot and Humid Climates GFP Insulation™ was selected to upgrade the 5th floor of the NYPA LEED Gold Rated Building in White Plains New York. 13 Floors will be renovated to upgrade the sustainability or Green features in the building. Argon [...]
Porsche Design Tower
Project Solution | Fi-Foil® Products The Porsche Design Tower project broke ground in April of 2013 on 2.2 acres of beautiful beachfront land at Collins Ave. in Sunny Isles Beach. The FI-FOIL® team began working with Sieger Suarez Architects in January 2014 to discuss the advantages [...]
The Slade at Channelside; Tampa, FL
Project Solution | AA2 Vapor Shield™ Perfect for Hot & Humid Tampa Climate The mixed-use development includes 2 buildings, 8-story and 280 condo units (780 to 1,539 Sq Ft). The Slade is ideally situated in the Channelside District, the location adjacent to Tampa’s port and downtown [...]